|
Eoli is a R&D project from 1 November 2002 to
31 October
2005,
supported by the European
Commission (project no. ICA4-CT-2002-10012).
Coordination: CESAME , UCL , Belgium
General papers
- Technical
annexes of the EOLI project
(pdf) .
- EOLI member
adresses (xls)
.
- Data format
(doc) .
- Signed contract
(pdf) .
- Reporting guidelines
for INCO program (doc) .
- Forms E-1 (two
pages: summary statement and details
by category) to complete the global cost
statement (pdf) .
EOLI Meetings
- Kick-off meeting,
November 7-9,
2002, Narbonne, France.
- Mid-year meeting,
May 7-9, 2003,
Mexico City, Mexico.
- Minutes
(doc)
.
- Meeting
documents
- First
mid-term report of the WP1 (pdf) .
- SPES
report related to the hardware sensor,
WP3 (doc) .
- Urgent
question to SPES about the final system
integration of EOLI project, WP8
(doc) .
- Standard
conditions of the experiments on May
9th, 2003 (doc) .
- First annual meeting,
October 15-17, 2003,
Compiègne, France.
- Minutes
(doc)
.
- Meeting documents
- WP1 general
report (doc) :
- UNAM report
related to WP1 (doc)
- UU report
related to WP1 (doc)
- LBE report
related to WP1 (doc)
- POLIMI report
related to WP1 (doc).
- Updated standard
conditions for WP1 (doc) .
- WP2 report :
CESAME/UCL report related to WP2
(doc) .
- WP3 report
: SPES factual summary of WP3 - task 3.1
(doc) .
- WP8 report from SPES
(doc)
.
- Mid-term
meeting, May 5-7, 2004,
Louvain-la-Neuve, Belgium.
- Minutes
of meeting (doc)
- Meeting documents
- WP1
introduction (doc)
- UNAM contribution
to WP1 (doc)
- LBE contribution
to WP1 (doc)
- POLIMI contribution
to WP1 (doc)
- UU contribution
to WP1 (doc)
Annexes (1),
(2)
- IBTech contribution
to WP1 (doc)
- WP2 reports
- UNAM report related
to WP2 (doc)
- CESAME/UCL contribution
to WP2 (doc)
- WP3 reports
- POLIMI contribution
to WP3 (doc)
- SPES report related
to WP3 (doc)
- WP5 report : LBE report
related to WP5 (doc)
- WP6 and WP7 reports
- UNAM and LBE
contributions to WP6/WP7 (pdf)
- QuestionsWP6
(doc)
- WP8 report by SPES
(doc)
- Second
annual meeting, November 22-24,
2004, Milano, Italia.
- Mid-third year meeting,
May 9-11, 2005,
Montevideo, Uruguay.
- Third annual meeting,
October 17-19, 2005, Mexico
City, Mexico.
- Minutes
(doc).
- Meeting documents.
Access to the on-line monitoring page of the EOLI plants
(web site)
Deliverables
- D1.1 - Report
on the validation of the software sensors and the optimal
control law in the pilot plant, t0+27 (doc).
- D1.2 - Report
on the evaluation of the process improvement with the application
of the optimal law : shock loads and the long-term stability of
the the system, t0+34 (pdf)(pdf).
- D1.3 - Report
on the model selection, parameter identification and validation,
t0+34 (pdf).
- D1.4 - Report
on the evaluation of the FDI system, t0+27 (pdf).
- D1.5 - Report
on the evaluation of the supervision system, t0+34 (pdf).
- D1.6 - Documentation
for the implementation, the tuning and the use of the FDI
and supervision systems, t0+36 (pdf).
- D1.7
- Report of the engineering project for the field-scale
pilot plant, t0+20 (pdf).
- D2.1
- Phenomenologically based, monitoring
and control oriented models, t0+2
(doc).
- D2.2
- Kinetic parameter estimated values for particular effluents and reactors,
t0+10 (pdf)(pdf).
- D2.3 - Validated model,
t0+18 (pdf).
- D2.4 - Values of indicators of removal
efficiency, t0+18 (pdf).
- D3.1 - Evaluation
on the applicability of existing sensors
and biosensors, t0+6 (doc).
- D3.2
- Automated DOstat and pHstat titration biosensor
for process control, t0+24 (doc).
- D3.3 - Simplified
low-cost on-line UV spectrometric sensor, t0+24
(pdf).
- D4.1 - Software
sensors for state forecasting accompanied with fault
residues information and confidence interval on outputs using
raw sensor signals, t0+27 (pdf).
- D4.2 - Report
on full-scale performance of the software sensors integrated
in the spupervision system, t0+30 (pdf).
- D5.1 - Control laws
based on software sensors for optimising the performance of
SBRs, t0+27 (pdf).
- D5.2 - Report on field-scale
performance of the adaptive optimal control law,
t0+30 (pdf).
- D6.1 - Diagnosis
algorithms for robustly detecting and isolating of a number of sensor,
actuator or/and proces faults for discontinuous SBR, t0+27
(pdf).
- D6.2 - User guide of the FDI system which
helps the operator of the reactor to reconfigure the process in abnormal
conditions, t0+30 (pdf)(zip)(zip).
- D7.1 -
Definition of the hierachical structure of the supervision
system, t0+19 (pdf).
- D7.2
- Software platform able to dialog with the inputs
and outputs of the diagnosis and control algorithms, t0+22
(pdf).
- D7.3
- Knowledge based system able to recognise and
classify a given "expected" but abnormal situation, t0+24
(pdf).
- D7.4 - Report
on the evaluation and on the validation of the supervision
system, t0+34 (pdf).
- D7.5 - Technical documentation
and user guide of the supervision system, t0+36
(pdf).
- D8.1
- Tables summarising the specifications
for the hardware (electronic) and software
main frame, t0+6 (doc).
- D8.2 - Hardware sensor network,
t0+30 (pdf).
- D8.3 - Software
main frame able to integrate ana manage the system, t0+28
(pdf).
- D8.4 - Report on the
evaluation and validation of the whole system, t0+36
(pdf).
Progress Reports
- First annual
report 2003 (final version - pdf), with the
following annexes (total annexes
- pdf):
- WP1 of POLIMI
(doc), UNAM (doc) and UU
(doc) .
- WP2 of CESAME (doc).
- WP3 of Gradient
(doc) and POLIMI (doc) .
- WP1/WP8 of UU
(doc).
- Annexes of IBTech:
Contents (xls),
Summary, index and lists (zip),
Diagrams and drawings (zip), Data
sheet of equipment (zip), Data sheet
of instrumentation (zip)
- Second annual
report 2004 (final version - pdf ) with
the following annexes :
- Third annual
report 2005 (final version - (doc) (pdf)
- Final report (final draft version
- (doc))
Others
- Souvenirs of
the EOLI meetings (go) .
|